September 14 to September 20

On the deck, we set up the table to check that everything fit. We’ll cut the legs to the right length accounting for the deck camber. We also checked the position to see how the chairs fit around the hatches. The table is designed to fold with the legs stored inside.

 

Animal fat is used on the leather covers of the blocks and stays.

 

 

September 21 to September 27

Samples of the tableware were placed in the cupboards to check the final fitting.

 

The cabinet door frames are lined up for shellacking.

 

 

September 28 to October 4

The legs of the deck table are being varnished by some team members.

 

Hashimoto began installing the sinks in the washrooms. These are new, but meant to blend with the overall classic look.